How much does a nuclear shelter at home cost?
In the Netherlands and Spain, all-in from €24,900 (Air), €44,900 (Compact) and €59,900 (Family), including 21% VAT, works, 30 days of supplies and power. In Japan, from ¥2.25 million incl. tax for Air (¥2.68 million with supplies and power), ¥5.38 million for Compact and ¥7.18 million for Family. The final price is set in the written quote after the site survey.
Where is the service available?
Only in the Netherlands and Spain (within the EU) and in Japan. Tell us your city in the form and we will confirm whether we cover it.
Can it withstand a nuclear explosion?
No. It does not withstand blast, heat or initial radiation near the centre of an explosion. What it offers is a place at home to shelter from radioactive fallout and contaminated outside air.
How much does it reduce radiation?
That depends heavily on the building and on the mass of walls and ceiling. We do not promise one number; after the site survey we state the expected reduction for your building in the design document. It will never be zero.
Why not use thin lead sheets, like in an X-ray room?
Boards and sheets sold for X-ray rooms are rated for low-energy X-rays. For the higher-energy gamma radiation from fallout, what mainly counts is the mass per square metre, so such thin materials generally reduce it much less. That is why we use heavy masonry instead.
Why 30 days of supplies?
Public guidance in the Netherlands, Catalonia and the EU asks households to be ready for at least 72 hours. US federal planning guidance says the first 12–24 hours of sheltering matter most and expects sheltering to last from hours to a few days. The 30 days are not for staying inside for a month — they are a margin for when electricity, water and deliveries stop. When to go outside is for the authorities to say.
Who carries out the works?
A Japanese engineer is responsible for your project from the survey to handover. Work that local rules reserve for licensed installers, such as electrical connections, is done with licensed local partners, and our engineer checks it.
Can it really be done in 1–2 weeks?
Yes, counted from the start of works to handover: Air 5–7, Compact 7–10, Family 10–14 working days. In the Netherlands and Spain, with the equipment in stock, it usually takes 3–4 weeks from signing because of the 14-day withdrawal period; if you ask us in writing we can start sooner, and if you then withdraw you pay for the work already done.
Why can the equipment take longer?
Air filtration units and airtight doors are in high demand worldwide and hard to source. We tell you stock and lead times with your quote. If equipment has to be ordered, the time from contract to handover grows by its delivery time; the 1–2 weeks of works start once it is secured.
Is it a certified shelter?
No. It is not built or certified to a national civil-protection shelter standard. We describe it as a nuclear fallout shelter room and state clearly what it does and does not protect against.
Do you include iodine tablets?
No. Potassium iodide (stable iodine) is a medicine and we do not supply or recommend it. In the Netherlands you take it only when the government says so (via NL-Alert or the radio); in Spain and Japan the authorities distribute it and say when to take it.
Can I do this in an apartment or a rented home?
In an apartment or on an upper floor, the Air plan, following the rules of your owners’ association. In a rented home, only with your landlord’s written consent and only what can be removed again.
What happens in a power cut?
We choose air filtration units that can be cranked by hand. Lights, radio and phones run on the portable power station and solar panel. We never put a fuel generator inside the room because of the risk of carbon monoxide.