NucShelGlobal Bridge
Get a free quote
Home nuclear fallout shelter room (visualisation): storage shelves, beds and an air filtration unit near the ceiling

Netherlands · Spain (EU) · Japan

Turn one room of your home into a nuclear fallout shelter room in 1–2 weeks.

A home bunker alternative without digging: clean air, sealing and shielding, built under the responsibility of Japanese engineers.

All-in from €24,900

Works, VAT, 30 days of supplies and power included

Japan: from ¥2.25 million incl. tax (works) · ¥2.68 million with 30 days of supplies and power

1–2 weeks from the start of works. With equipment in stock, usually 3–4 weeks from contract.

Visualisation

Real shelters

Real shelters

Steel shelters, their airtight doors and fabrication. The photos show examples of steel shelters and interior equipment. For the specification of each plan, see the prices section.

Three black steel shelter rooms in a workshop, doors open, with wood-grain interiors and an air conditioner inside
Steel shelter rooms; wood-grain interior behind the open doors
A black steel box-type shelter standing outdoors, with a tower and pipe openings on top
Steel box-type shelter outdoors, with a ventilation tower
A black steel shelter with a grey airtight door and a round hand wheel
Airtight door with a hand wheel
A large steel shelter being fabricated in a factory
Fabrication in a factory

Not sure which plan fits? Ask for a free quote — no obligation.

Get a free quote

What it can and cannot do

What it can do

  • Shelter at home from radioactive fallout and contaminated air
  • Filtered air at overpressure, hand-crank backup
  • 30 days of water, food, toilet and power

What it cannot do

  • No protection from blast or heat near an explosion
  • Radiation is reduced, never zero
  • Not a certified shelter; no iodine tablets
Read the full list
  • Give your household a room at home to shelter from radioactive fallout (radioactive dust carried by the wind) and contaminated outside air
  • Feed filtered air into the room and keep it at slight overpressure, so outside air does not leak in through gaps. The fan can also be cranked by hand in a power cut
  • Reduce radiation from fallout with a heavy masonry lining and distance (Compact and Family; how much depends on the building and is set out in the design document)
  • Hold water, food, toilet supplies and power for 30 days, for when electricity, water and deliveries stop
  • It does not withstand blast, heat or initial radiation near the centre of a nuclear explosion
  • It cannot bring radiation down to zero. It reduces exposure; it does not eliminate it
  • A heavy shielding lining cannot go on an ordinary upper floor. In apartments and upper floors we offer Air (clean air and sealing) only
  • It is not built or certified to a national civil-protection shelter standard (such as the Swiss one)
  • We do not supply or recommend potassium iodide (stable iodine) tablets, which are a medicine

Official advice starts with the same step. In the Netherlands, if the government asks you to shelter, you close doors and windows and anything that ventilates, such as the cooker hood and vents. Spain’s Civil Protection names sheltering indoors as the first measure in a nuclear emergency: close doors and windows, seal gaps with a damp cloth and switch off fans and air conditioning. Japan’s civil-protection portal likewise advises staying indoors, turning off ventilation fans, closing windows and taping up gaps to seal the room. This service prepares that kind of sealed room in advance.

How it works

Four layers in one room

Air

Filtration and overpressure

Outside air passes through a HEPA filter (fine particles) and activated carbon (gases) before it enters the room, which is kept at slightly higher pressure than outside. A pressure gauge shows at a glance that the overpressure is holding. We choose units that can be cranked by hand in a power cut.

+OverpressureOutside airHEPA + carbonFiltered airRelief valvePressure gauge

Air filtration units and airtight doors are in high demand worldwide and hard to source. We tell you stock and lead times with your quote. “1–2 weeks from the start of works” assumes we start once the equipment is secured.

Air filtration unit and pressure gaugeVisualisation
Air filtration unit and pressure gauge

Sealing

Door, windows, vents and cable entries

Overpressure only works if the gaps are closed. We seal the door, windows, vents and every socket and cable entry. The Compact and Family plans replace the door with a steel airtight door.

Air filtration units and airtight doors are in high demand worldwide and hard to source. We tell you stock and lead times with your quote. “1–2 weeks from the start of works” assumes we start once the equipment is secured.

Steel airtight door and the sealing around the frameVisualisation
Steel airtight door and the sealing around the frame

Shielding

A heavy masonry lining

Fallout gamma radiation is reduced by mass and by distance. As a rule of thumb, about 6 cm of concrete halves it, while wood needs about 22 cm (US sources). In Compact and Family we build a heavy lining — for example calcium silicate blocks or filled concrete blocks — inside the existing walls. It weighs several hundred kilograms per m², so it can only go on a floor that rests on the ground or in a basement. We calculate the expected reduction for your building and state it in the design document.

OutsideInsideExisting wallHeavy masonryAirtight layerInterior finish
Wall section (Compact and Family). A heavy masonry lining is built inside the existing wall, then an airtight layer, then the interior finish. Thicknesses are illustrative.

Supplies and power

30 days on the shelves

Water at 3 litres per person per day, long-life food, portable toilet supplies, bedding and hygiene items, plus a portable power station, a solar panel, a wind-up radio and a dosimeter — enough for 30 days.

Storage shelves with 30 days of water, long-life food and a portable power stationVisualisation
Storage shelves with 30 days of water, long-life food and a portable power station

Good to know

  • Fallout radiation drops quickly over time. As a rule of thumb, it falls to about 1/10 each time the elapsed time multiplies by 7 (US federal planning guidance).
  • The same guidance says the first 12–24 hours in a protected place matter most, and expects sheltering to last from hours to a few days.
  • The 30 days of supplies are not for staying inside for a month. They are a margin for when electricity, water and deliveries stop. When to go outside is for the authorities to say.

Not sure which plan fits? Ask for a free quote — no obligation.

Get a free quote

Our engineers

Built under the responsibility of Japanese engineers

A shelter room only works if the details are right. That is why a Japanese engineer is in charge of your project — from the site survey and design to the works and handover.

Hands laying a brick on mortarIllustrative image
Heavy masonry, laid by hand
A craftsman’s hands cutting timber with a Japanese sawIllustrative image
Careful hand work

Where local rules require licensed installers, for example for electrical connections, our Japanese team works with licensed local partners and checks their work.

  1. 01

    One engineer in charge

    The same Japanese engineer is responsible for the survey, the design document, the works and the handover.

  2. 02

    Sealing is craftsmanship

    Airtightness depends on care: every gap, every cable and pipe entry, and the door frame are sealed and checked.

  3. 03

    Checked before handover

    Before handover we check with instruments that the room holds its overpressure, and give you the record. The pressure gauge stays with the room.

  4. 04

    Handover you can use

    We walk your household through hand-crank operation, the gauge and where everything is stored.

Not sure which plan fits? Ask for a free quote — no obligation.

Get a free quote

Visuals

Just one room of your home

Examples of converting one room of a house. We do not work on the whole home — only the room you will shelter in.

Section visualisation of a house with one ground-floor room converted into a shelter roomVisualisation
One ground-floor room of a house converted into a shelter room (section)
Cutaway visualisation of the Family plan (about 10 m², 4 people): two bunk beds, storage shelves, air filtration unit and steel airtight doorVisualisation
Family · about 10 m² · 4 people
Cutaway visualisation of the Compact plan (about 5 m², 2 people): bunk bed, shelves, compact toilet and air filtration unitVisualisation
Compact · about 5 m² · 2 people
Section visualisation of a Spanish house with a semi-basement: the shelter room sits next to the garageVisualisation
A Spanish house with a semi-basement: the shelter room next to the garage (section)
Illustration of an underground shelter next to a house, with beds, living area, storage shelves and a ventilation shaftIllustrative image
Illustration of an underground shelter beside a house. Underground shelters have separate timelines and costs — please ask us individually.
Illustration of an underground shelter beneath a garden swimming poolIllustrative image
Illustration of an underground shelter beneath a garden pool. Separate timeline and cost — please ask us individually.

The 3D images are visualisations. Actual specifications and dimensions are set in the design document after the site survey.

Not sure which plan fits? Ask for a free quote — no obligation.

Get a free quote

Plans and prices

All-in prices

All prices are published: totals including works and tax.

Available only in the Netherlands and Spain (within the EU) and in Japan. Euro prices include 21% VAT, the same in both countries; yen prices for Japan are reference prices incl. tax, confirmed by quote after the survey.

Air

2 people · Existing room (up to about 10 m²)

All-in from€24,900

Works, VAT, 30 days of supplies and power

Keep your room as it is and add clean air and sealing.

Works (from start): 5–7 working days

Included

  • Air filtration unit (HEPA + carbon, hand crank) and installation
  • Sealing: door, windows, vents, cable entries
  • Pressure gauge, pressure check and record
  • Survey and design document
  • 30 days of supplies and power for 2
  • VAT

Not included

  • Travel outside our areas
  • Building repairs, if needed
  • Owners’ association application
  • Permit fees, if any

Where: Houses and apartments, upper floors too (owners’ association rules apply)

Request a quote for this plan

Compact

2 people · Dedicated room, about 5 m²

All-in from€44,900

Works, VAT, 30 days of supplies and power

Air, plus airtight door and heavy shielding — a dedicated room for two.

Works (from start): 7–10 working days

Included

  • Everything in Air
  • Steel airtight door
  • Heavy masonry lining and ceiling
  • Structural check
  • Bunk bed, shelves, compact toilet, lighting
  • VAT

Not included

  • Travel outside our areas
  • Building repairs, if needed
  • Owners’ association application
  • Permit fees, if any

Where: Ground-bearing floor or basement only (e.g. ground floor of a house; in Spain also sótano or garaje)

Request a quote for this plan

Family

4 people · Dedicated room, about 10 m²

All-in from€59,900

Works, VAT, 30 days of supplies and power

Everything in Compact, sized for four.

Works (from start): 10–14 working days

Included

  • Everything in Compact, for 4
  • Two bunk beds
  • 30 days of supplies for 4
  • Extra power capacity
  • VAT

Not included

  • Travel outside our areas
  • Building repairs, if needed
  • Owners’ association application
  • Permit fees, if any

Where: Ground-bearing floor or basement only (e.g. ground floor of a house; in Spain also sótano or garaje)

Request a quote for this plan
  • In Japan, buildings and the contract process differ, so the price is set by the quote after the site survey; the yen figures are reference prices including tax. Renewal plans and supply values for Japan are shown in the quote.
  • Air filtration units and airtight doors are in high demand worldwide and hard to source. We tell you stock and lead times with your quote; works start once the equipment is secured.

Already have a quote from another company? Send it to us and we will make a proposal on the same terms for comparison.

Why we can offer these prices

  • We do not build or dig anything new — we use a room you already have
  • Three standard specifications
  • No showroom; the first pre-check is online
  • Our Japanese engineering team handles everything from survey to works, with fewer companies in between
  • Equipment and supplies are bought in bulk (filtration units and airtight doors are hard to source — we tell you stock and lead times with your quote)
Compare plans in detail
AirCompactFamily
Capacity2 people2 people4 people
RoomExisting room (≤ ~10 m²)~5 m² dedicated room~10 m² dedicated room
WhereAny floor, houses and apartmentsGround-bearing floor or basementGround-bearing floor or basement
Air filtration (overpressure, hand crank)IncludedIncludedIncluded
Pressure gaugeIncludedIncludedIncluded
Sealing of the roomIncludedIncludedIncluded
Steel airtight door—IncludedIncluded
Heavy masonry lining and ceiling—IncludedIncluded
Structural check—IncludedIncluded
Beds, shelves, compact toilet—1 bunk bed2 bunk beds
Lighting and electrics—IncludedIncluded
Supplies and power (30 days)2 people2 people4 people
Extra power capacity——Included
Works (from start)5–7 working days7–10 working days10–14 working days
Price NL · ES (incl. VAT)€24,900€44,900€59,900
Japan (reference, incl. tax)¥2.25m¥5.38m¥7.18m

Yearly renewal plan (NL · ES)

Rotation of supplies plus one inspection a year (overpressure and gauge, power, dosimeter battery and more). For Japan, shown in the quote.

2 people (Air, Compact)
€490 / year
4 people (Family)
€790 / year

Filter replacement intervals and costs will be confirmed from the manufacturer’s documentation for the chosen unit and stated in the design document.

Not sure which plan fits? Ask for a free quote — no obligation.

Get a free quote

30 days of supplies

30 days of supplies

The Dutch government (Denk Vooruit), Catalonia’s Civil Protection and the European Commission all ask households to be able to manage on their own for at least 72 hours; Denk Vooruit suggests 3 litres of water per person per day, the same figure Japan’s agriculture ministry uses for home stockpiles. Our 30 days are an extra margin on top of that, for when electricity, water and deliveries stop. Everything is on the shelves at handover, and quantities can be adjusted to your household’s tastes and allergies.

Two-tier bunk beds inside a shelter, with a ventilation duct along the ceiling
Bunk beds and a ventilation duct (example of equipment; differs from the plan specification)
Washroom and toilet area inside a shelter, with green walls and stainless steel basins
Washroom and toilet area (example of equipment; differs from the plan specification)
See the full list and quantities
Item1 person (ref.)2 people4 people
Drinking water (3 L per person per day)90 L180 L360 L
Long-life food (about 2,000 kcal a day)30 days60 person-days120 person-days
Toilet bags (5 a day) and dry-toilet seat150 + seat300 + seat600 + seat
Bedding (sleeping bag, mat)1 set2 sets4 sets
Hygiene, waste bags, first aid1 person2 people4 people
Portable power station (~1 kWh) and solar panel1 each1 each2 each
Wind-up / solar radio111
Lighting and batteriesSetSetSet
Dosimeter111
Shelving112
Weight (water only)about 90 kgabout 180 kgabout 360 kg
Estimated value (NL · ES retail, incl. VAT)€1,800–3,100€2,200–3,800€4,200–6,400
  • Quantities are our planning figures: 3 L of water, about 2,000 kcal and 5 toilet uses per person per day.
  • Long-life food alone is low in vitamins and fibre, so we suggest adding vegetable juice or supplements.
  • The estimated value is included in the plan price (1 person is for reference). For Japan, shown in the quote.
  • Potassium iodide (stable iodine) is not included. In the Netherlands it is distributed around nuclear power plants and sold at pharmacies and drugstores; you take it only when the government tells you to. In Spain, health authorities distribute it under the nuclear emergency plan. In Japan, local governments stock and distribute it.

Process

Process

“1–2 weeks” counts from the start of works to handover. In the Netherlands and Spain a contract signed at your home comes with a 14-day withdrawal period, which we use to secure the equipment — so with equipment in stock it usually takes 3–4 weeks from signing. If equipment has to be ordered, add its delivery time.

  1. 1

    Enquiry and online pre-check

    Free · photos and floor plan

  2. 2

    Site survey and written quote

    Half a day on site

  3. 3

    Contract and preparation

    NL · ES: 14 days · equipment secured

  4. 4

    Works

    5–14 working days

  5. 5

    Handover

    Pressure check and record, walkthrough

Air filtration units and airtight doors are in high demand worldwide and hard to source. We tell you stock and lead times with your quote. “1–2 weeks from the start of works” assumes we start once the equipment is secured.

Step-by-step details, timeline and withdrawal rights
  1. 01

    Free pre-check

    Online. From photos and a floor plan we tell you which plan fits.

  2. 02

    Site survey (half a day)

    We check floor, walls, windows, vents and the route for bringing materials in, and whether a permit is needed.

  3. 03

    Design document and quote

    Specification, expected shielding, schedule, equipment lead times and fixed price in writing. We never ask you to sign on the spot.

  4. 04

    Contract

    Only once you are happy with everything.

  5. 05

    Preparation

    14 days in NL and ES (your withdrawal period). We secure the equipment and fix the schedule; if it has to be ordered, works start once it has arrived.

  6. 06

    Works

    Air 5–7, Compact 7–10, Family 10–14 working days.

  7. 07

    Handover and walkthrough

    We check the overpressure with instruments, give you the record and go through operation and storage with your household.

Timeline (Netherlands and Spain)

  1. Pre-check, survey, quote
  2. Contract
  3. 14 days of preparation
  4. Works
  5. Handover
Air
14 days preparation5–7 working days
Compact
14 days preparation7–10 working days
Family
14 days preparation10–14 working days

With equipment in stock, usually 3–4 weeks from contract to handover. If equipment has to be ordered, add its delivery time.

About withdrawal and cooling-off periods

  • Netherlands and Spain: under EU consumer rules, you can usually withdraw from a contract signed at your home within 14 days (in some cases longer). If you want works to start sooner, you can ask us explicitly in writing; if you then withdraw after works have started, you pay for the part already carried out.
  • Japan: contracts that count as door-to-door sales can be cancelled within 8 days (cooling-off), and you can ask for the home to be restored free of charge even if works have changed it.
  • This is general information, not legal advice.

Not sure which plan fits? Ask for a free quote — no obligation.

Get a free quote

Comparing approaches

Compared with other approaches

See the comparison table
ApproachTypical priceTypical timeKeep in mind
Netherlands · Spain · Germany
Custom underground shelter (Spain)€50,000–180,000, average about €150,0004–5 months to 1 year, plus permitExcavation and permit; VAT not stated
Prefabricated underground unit (Spain)2 people from €15,000, 4 people from €25,000Not publishedUnit only: installation, excavation and permit extra
Retrofit inside a house (Germany)From about €35,000Not publishedSupplier’s statement; contents and VAT not stated
Basement conversion (Germany)From €50,000Not publishedPress figure; contents and VAT not stated
Japan (reference)
Air filter retrofitAbout ¥2.5–2.8 millionWeeks to 1 month from orderUnit (some with basic installation, tax often excluded); room sealing and supplies not included
Indoor boxFrom ¥6.58 million1 to a few days on site (made to order)Tax and installation not stated; floor reinforcement extra in one example
Outdoor unit¥5.5–about 13.8 millionAbout 1.5–2.5 months from orderExcl. tax in one example; foundation and transport extra
Underground shelterAbout ¥8–28 millionAbout 5–6 months after building approval (reinforced concrete)Tax and works treated differently per example
NucShel (room conversion)NL · ES €24,900–59,900 and up incl. VAT · Japan from ¥2.25 million incl. tax (¥2.68 million with supplies)5–14 working days from start of worksWorks and tax included; 30 days of supplies and power included (Japan Air: in the ¥2.68 million version)

Prices as published or reported, checked November 2026. The right-hand column says what each price includes. Where it differs from our all-in prices (works and tax included, and supplies and power except the Japanese Air base price), the figures are not directly comparable. No company or product names are shown.

Your home

Where we work

Available only in the Netherlands and Spain (within the EU) and in Japan.

Terraced brick houses in the NetherlandsIllustrative image
Netherlands
A detached house in Spain with a palm treeIllustrative image
Spain
A residential street with houses in JapanIllustrative image
Japan
What your home needs
  • Service area

    Available only in the Netherlands and Spain (within the EU) and in Japan.

  • Houses

    All plans. Compact and Family need a room on a floor that rests on the ground, or a basement — usually the ground floor of a house, and in Spain also a sótano or garaje.

  • Apartments and upper floors

    Air plan. In the Netherlands, works that touch common parts such as the façade need the consent of the VvE. In Spain you must inform the comunidad de propietarios beforehand, and works affecting the structure need a vote of the owners’ meeting. In Japan, works inside your unit need prior written approval from the management association, and windows, frames and outer walls are common parts.

  • Rented homes

    We only work with your landlord’s written consent, and only on what can be removed again when you move out.

  • Permits

    Interior works that do not change the structure usually need no building permit, but a heavy masonry lining may count as a structural change. In Japan, since April 2025 large renovations of wooden houses can also need building confirmation. We check this at the survey and put it in the design document.

  • Floor load

    Water alone for 4 people for 30 days weighs about 360 kg, and a masonry lining several hundred kilograms per m². That is why Compact and Family are limited to ground-bearing floors and basements.

FAQ

FAQ

How much does a nuclear shelter at home cost?

In the Netherlands and Spain, all-in from €24,900 (Air), €44,900 (Compact) and €59,900 (Family), including 21% VAT, works, 30 days of supplies and power. In Japan, from ¥2.25 million incl. tax for Air (¥2.68 million with supplies and power), ¥5.38 million for Compact and ¥7.18 million for Family. The final price is set in the written quote after the site survey.

Where is the service available?

Only in the Netherlands and Spain (within the EU) and in Japan. Tell us your city in the form and we will confirm whether we cover it.

Can it withstand a nuclear explosion?

No. It does not withstand blast, heat or initial radiation near the centre of an explosion. What it offers is a place at home to shelter from radioactive fallout and contaminated outside air.

How much does it reduce radiation?

That depends heavily on the building and on the mass of walls and ceiling. We do not promise one number; after the site survey we state the expected reduction for your building in the design document. It will never be zero.

Why not use thin lead sheets, like in an X-ray room?

Boards and sheets sold for X-ray rooms are rated for low-energy X-rays. For the higher-energy gamma radiation from fallout, what mainly counts is the mass per square metre, so such thin materials generally reduce it much less. That is why we use heavy masonry instead.

Why 30 days of supplies?

Public guidance in the Netherlands, Catalonia and the EU asks households to be ready for at least 72 hours. US federal planning guidance says the first 12–24 hours of sheltering matter most and expects sheltering to last from hours to a few days. The 30 days are not for staying inside for a month — they are a margin for when electricity, water and deliveries stop. When to go outside is for the authorities to say.

Who carries out the works?

A Japanese engineer is responsible for your project from the survey to handover. Work that local rules reserve for licensed installers, such as electrical connections, is done with licensed local partners, and our engineer checks it.

Can it really be done in 1–2 weeks?

Yes, counted from the start of works to handover: Air 5–7, Compact 7–10, Family 10–14 working days. In the Netherlands and Spain, with the equipment in stock, it usually takes 3–4 weeks from signing because of the 14-day withdrawal period; if you ask us in writing we can start sooner, and if you then withdraw you pay for the work already done.

Why can the equipment take longer?

Air filtration units and airtight doors are in high demand worldwide and hard to source. We tell you stock and lead times with your quote. If equipment has to be ordered, the time from contract to handover grows by its delivery time; the 1–2 weeks of works start once it is secured.

Is it a certified shelter?

No. It is not built or certified to a national civil-protection shelter standard. We describe it as a nuclear fallout shelter room and state clearly what it does and does not protect against.

Do you include iodine tablets?

No. Potassium iodide (stable iodine) is a medicine and we do not supply or recommend it. In the Netherlands you take it only when the government says so (via NL-Alert or the radio); in Spain and Japan the authorities distribute it and say when to take it.

Can I do this in an apartment or a rented home?

In an apartment or on an upper floor, the Air plan, following the rules of your owners’ association. In a rented home, only with your landlord’s written consent and only what can be removed again.

What happens in a power cut?

We choose air filtration units that can be cranked by hand. Lights, radio and phones run on the portable power station and solar panel. We never put a fuel generator inside the room because of the risk of carbon monoxide.

Not sure which plan fits? Ask for a free quote — no obligation.

Get a free quote

Contact

Free quote & consultation

Tell us a little about your home. We reply with which plan fits and a first estimate.

  • Free advice, free quoteNo cost to ask.
  • Nothing decided yet? That is fineQuestions only are welcome.
  • No pressureWe never ask you to sign on the spot.

After you send the form

  1. 1
    Send the formFour fields are enough.
  2. 2
    Online pre-checkPhotos and floor plan, by email.
  3. 3
    Survey and written quoteA fixed price in writing.
Hands of three generations of a family placed togetherIllustrative image

Email or phone — one is enough required

Tell us more (optional)

By sending, you agree that your details are used to reply to your enquiry, carry out the pre-check, prepare a quote and prepare a contract. They are sent encrypted and never sold or shared for advertising. Privacy policy

Get a free quoteSee prices